Great Western Railway History, 1892 to 1948

The Great Western Railway (GWR) was a British railway company, one of the 'Big Four' from 1923 to 1947, whose history from 1892 to 1948 runs from its last broad-gauge train out of Paddington on 20 May 1892 to 1 January 1948, when it became the Western Region of British Railways. The company had been founded at a meeting in Bristol on 21 January 1833, won its enabling Act of Parliament on 31 August 1835, ran its first trains in 1838 from Paddington to Taplow, near Maidenhead, and completed its first main line to Bristol in 1841. Isambard Kingdom Brunel, appointed engineer in 1833, laid that line to his 7-foot broad gauge, the subject of our piece on Brunel's broad gauge; on the Monday after the final broad-gauge departure, the trains from Penzance were worked by standard-gauge locomotives. When the Railways Act 1921 merged the remaining independent railways into larger companies, the GWR was the one company that came through with its identity intact.
Cutting the 'Great Way Round': New Lines and Faster Goods, 1900 to 1910
Some people called the GWR 'God's Wonderful Railway' and others the 'Great Way Round', but the name it was famed for was the 'Holiday Line'. From 1908 the company advertised itself under that title, as it took very large numbers of people to resorts in Wales and the south-west of England.
Once 1892 had freed the GWR from running trains on two gauges, it put its effort into new lines and into improving old ones, with the aim of shortening routes that had been roundabout.

Goods traffic began using the Stert and Westbury line on 29 July 1900, and passenger trains followed on 1 October 1900. The new line, 14 miles 35 chains in length, made the trip between London Paddington and Weymouth shorter.
In 1903 came the South Wales and Bristol Direct Railway, running from Wootton Bassett Junction to join the line through the Severn Tunnel.
The Langport and Castle Cary line was also built to shorten journeys out of London. Its first section, from Castle Cary to Charlton Mackrell, opened on 1 July 1905, and the line was completed in 1906. Taken together, the new lines between Patney and Chirton and Cogload brought the distance from London to Penzance down from 325½ to 305¼ miles, and put Taunton 143 miles from London instead of 163¼.
Further north, the Honeybourne Line between Cheltenham, Stratford-upon-Avon and Birmingham was built from 1900 to 1906. The GWR had taken over the powers to build the Birmingham and North Warwickshire line in July 1900, and that line opened to goods on 9 December 1907 and to passengers on 1 July 1908. Joined to the Cheltenham and Honeybourne line, it gave the GWR a new main line from the West Midlands to the South West of England and South Wales, shorter than the older routes by way of Oxford and Hereford. In 1910 the GWR and the Great Central Railway together built the Birmingham Direct Line, which shortened the journey from London to the North.
General goods wagons were built with vacuum brakes from 1904. The GWR's first general goods train with vacuum brakes ran between London and Bristol in 1905, using new wagons that had small wheels but were fitted with vacuum brakes. Other such services followed, forming a network of fast goods trains between the main centres of production and population, scheduled to average 35 mph.
Livery, Named Expresses and Passenger Classes
Many GWR locomotives came from the company's own workshops at Swindon, and they were painted a middle chrome green. For most of the company's life its passenger coaches carried a two-tone chocolate and cream livery, although they were plain brown or red until 1864 and again from 1908 to 1922. In 1900 the first coaches with electric lighting went into service.

The Flying Dutchman, a late-morning express between London and Exeter, was named after the horse that won the Derby and the St Leger in 1849. The train made its last broad-gauge run on 19 May 1892, the day before the final broad-gauge service left Paddington.
The Cornish Riviera Express, a new service with few stops, began on 1 July 1904 between London and Penzance, running without a stop as far as Plymouth. It reached Plymouth in 4 hours 25 minutes, 28 minutes quicker than the fastest train before it. In 1904 and 1905 it ran only in summer, and from 1906 it was a permanent part of the timetable.
The Cheltenham Spa Express got its name after the first batch of Charles Collett's Castle class 4-6-0 express engines entered service in 1923 and made much faster timings possible.
From 1840 passengers could ride in the slow goods trains, in what became third class. The Railway Regulation Act 1844 then made the GWR, along with every other British railway, serve each of its stations with trains that carried third-class passengers, charging no more than one penny a mile and running at 12 mph or faster.
Cheap-day excursion tickets were first sold in May 1849, and season tickets followed in 1851. Another parliamentary order brought smoking carriages onto trains from 1868. By 1882 every train except the fastest expresses had third-class carriages, and the Cheap Trains Act 1883 led to workmen's trains with special low fares at certain times of day. Until 1869 second-class passengers produced most of the revenue, but third-class numbers grew so large that second-class facilities were withdrawn in 1912.
City of Truro and the 1904 Speed Claim: Myth vs Record
City of Truro was a 4-4-0 steam locomotive built for the GWR at Swindon Works in 1903, to a design by George Jackson Churchward, who had replaced William Dean in 1902. It was the eighth of a batch of ten in the 3700, or 'City', class, all named after cities on the GWR system, and it was delivered from Swindon Works in May 1903.

On 9 May 1904 the engine was hauling the 'Ocean Mails' special from Plymouth to London Paddington when Charles Rous-Marten timed it at 8.8 seconds between two quarter-mile posts. Taken as exact, that time gives a speed of 102.3 mph, on the descent from Whiteball Summit in Somerset. Rous-Marten's stopwatch, however, counted only in fifths of a second, so the next longer time it could have shown was 9 seconds, which equals exactly 100 mph.
Wary of its reputation for safety, the GWR at first let only the overall timings of the run appear in print. Neither the report in The Times the following day nor Rous-Marten's article in The Railway Magazine for June 1904 gave the top speed. Two local Plymouth newspapers did report that the train had run at between 99 and 100 mph down Wellington Bank.
Rous-Marten first put the maximum speed into print in 1905, without naming the locomotive or the railway. On 20 June 1905 he wrote to James Inglis, the GWR's general manager, trying to win permission to publish the record, and before his death in 1908 he did name the engine as City of Truro. Official confirmation from the GWR came in 1922, when it published that letter as evidence, and from 1922 City of Truro featured heavily in the company's publicity.
The milepost timings Rous-Marten took fit a speed of 100 mph or a little more. The most recent research, which used computer simulation of the locomotive's performance, showed that 100 mph was possible, but John Heaton and Bill Hemstock concluded that its top speed was probably a little below 99 mph, reached near milepost 168.
Nor was City of Truro the world's fastest vehicle in May 1904: an experimental electric line near Berlin had reached 130 mph in 1903. An earlier, unconfirmed run of more than 100 mph was claimed in the US in 1893 for No. 999, a 4-4-0 of the New York Central and Hudson River Railroad, but little evidence backs it; unlike City of Truro's run, there are no timings showing it accelerating up to 100 mph.
After the 1904 run the locomotive carried on in everyday service. It was partly rebuilt in 1911 and 1915 and was given a new number in December 1912. By 1931 it had become obsolete, and it was withdrawn in March 1931.
The Castle and King Classes, 1922 to 1932
The Castle class grew out of George Jackson Churchward's Star class of 1907, which brought in the basic layout of four cylinders, a 4-6-0 wheel arrangement, long-travel valves and a Belpaire firebox that came to mark GWR express passenger engines. There were 61 Stars in service by 1914, but after the First World War an improved design was needed. Charles Collett succeeded Churchward as Chief Mechanical Engineer in 1922 and straight away set out to design a new engine that would add to the Stars and replace them on the heaviest expresses.
Collett placed an order with Swindon Works for ten locomotives in 1923. The first, No. 4073 Caerphilly Castle, was completed in August 1923 and made its debut at Paddington station on 23 August 1923, and the other nine followed by April 1924.

After its introduction in 1923, the Castle class, with a tractive effort of 31,625 lbf, was the most powerful express passenger class in the country on that measure, until the Southern Railway's Lord Nelson class took the title in 1926. The engines could reach speeds of up to 100 mph. During 1924 Caerphilly Castle was shown at the British Empire Exhibition at Wembley next to Nigel Gresley's Flying Scotsman, and on 28 April 1924 King George V drove No. 4082 Windsor Castle from Swindon Works to Swindon station, with Queen Mary beside him on the footplate. Exchange trials began in April 1925: 4079 Pendennis Castle ran for the GWR on the East Coast Main Line, while the LNER sent 4474 Victor Wild to run on GWR tracks.
The class was noted for its running on the Cheltenham Flyer in the 1930s. On 6 June 1932 No. 5006 Tregenna Castle ran the Cheltenham Flyer from Swindon to Paddington, 77.25 miles, at a start-to-stop average of 81.68 mph, a world record for steam traction.
By 1927 a series of bridge renewals had been carried out on the Great Western main lines, and in that year the GWR introduced its 6000, or King, class of 4-6-0 locomotives for express passenger work. Twenty were ordered from Swindon Works in 1927, and a second batch of ten appeared between May and August 1930. In all, 31 were built at Swindon, although only 30 were in service at the same time. With an original tractive effort of 40,300 lbf, they were the largest locomotives the GWR built, apart from its unique Pacific, The Great Bear. The Kings hauled the GWR's main expresses between London and the West of England, and over the Chiltern line to Birmingham and Wolverhampton.
The first King, No. 6000 King George V, was completed at Swindon Works in June 1927. After a period of running in, it was shipped to the United States in August 1927 to take part in the Baltimore and Ohio Railroad's centenary celebrations.
The Railways Act 1921 and the Big Four, 1921 to 1947
At the outbreak of the First World War in 1914, the GWR, like most major railways in Britain, was taken into government control, though not into government ownership, and that state control continued until 1921.
The Railways Act 1921 was meant to stop the losses that many of the country's 120 railway companies were making, by merging them into four large companies: the Great Western Railway, the London, Midland and Scottish Railway (LMS), the London and North Eastern Railway (LNER) and the Southern Railway (SR). Its third reading in the House of Commons took place on 9 August 1921, when it passed by 237 votes to 62, and it received royal assent on 19 August 1921. The process, known as 'The Grouping', came into effect on 1 January 1923, and the four companies were called the 'Big Four' from 1923 to 1947.

Full nationalisation had been considered and rejected; it was carried out only after the Second World War, under the Transport Act 1947. The GWR alone kept its pre-grouping identity, and it imposed that identity on all the railway companies it absorbed. The Railway Magazine coined the name 'Big Four' in its February 1923 issue, with the headline 'The Big Four of the New Railway Era'.
Sir Felix Pole, the GWR's general manager from 1921 to 1929, oversaw the grouping of the South Wales railways into the GWR after the Railways Act 1921. The same Act placed most of the large coal-exporting docks in South Wales, such as those at Cardiff, Barry and Swansea, in GWR ownership.
The Southern Railway was mainly a passenger railway and, despite its small size, carried more than a quarter of all UK passenger traffic, because its territory included some of the country's most densely populated districts and many busy London commuter lines. The three larger companies relied heavily on freight, coal above all, as well as on long-distance passengers. The LNER never made a profit, partly because it had inherited the large debts of the Great Central Railway. The LMS struggled to reconcile different traditions, especially in locomotive engineering, until 1932, when Josiah Stamp brought in William Stanier from the GWR as its chief mechanical engineer.
The Development (Loans, Guarantees and Grants) Act 1929 let the GWR raise money in return for creating jobs, and the money went on improving stations, among them London Paddington and Cardiff General, on better facilities at depots and on extra tracks to ease congestion. As a legacy of the broad gauge, trains for some routes could be built a little wider than was normal in Britain, and these included the 'Super Saloons' built in 1929 for the boat trains that carried transatlantic passengers to London in luxury. For the company's centenary in 1935, new 'Centenary' carriages were built for the Cornish Riviera Express, again making full use of the wider loading gauge on that route.
The GWR, the LMS and the Southern bought British and Foreign Aviation, Ltd. and set up Railway Air Services Ltd., and the GWR and the Southern between them wholly owned Channel Island Airways, Ltd., together with its subsidiaries Jersey Airways and Guernsey Airways.
When the Second World War broke out in 1939, the GWR went back under direct government control. During the war the managements of the railway companies were united under the Railway Executive Committee, in effect becoming one company, and from 1 January 1941 the Government hired the railways, an arrangement set to run until one year after the war ended. James Milne, general manager from 1929 to 1947, saw the GWR through the war, and Frederick Hawksworth became Chief Mechanical Engineer in 1941, the last to hold the post at the GWR. When the war ended, Labour was in government and once more planned to bring the railways into national ownership.
Nationalisation, 1948
After a couple of years spent trying to recover from the damage of the war, the Great Western Railway became the Western Region of British Railways on 1 January 1948, the date on which the Big Four were nationalised to form British Railways under the Transport Act 1947. The areas the Big Four had served formed the basis of the new British Railways regions. Frederick Hawksworth went on producing GWR-design locomotives until after nationalisation, and wagons without vacuum brakes still made up most of the fleet in 1948.
The Great Western Railway Company lived on as a legal entity for nearly two more years and was formally wound up on 23 December 1949. The British Railways regions stopped being operating units after sectorisation in the 1980s and were finally abolished in 1992, in the run-up to privatisation.

Rails & Rivals, our game on Steam, is a turn-based railroad strategy board game for 2 to 6 players: each player runs a rail company, lays track across a hex map and carries goods between cities, and the wealthiest company wins. The how to play page has the rules.
Keep reading
Sources
- Great Western Railway (Wikipedia)
- Great Western Railway 1835 - 1948 (Science Museum Group)
- Stert and Westbury Railway (Wikipedia)
- Langport and Castle Cary Railway (Wikipedia)
- Gloucestershire Warwickshire Railway (Wikipedia)
- North Warwickshire Line (Wikipedia)
- Cornish Riviera Express (Wikipedia)
- Flying Dutchman (train) (Wikipedia)
- Cheltenham Spa Express (Wikipedia)
- GWR 3700 Class 3440 City of Truro (Wikipedia)
- Letter about 100mph speed record of City of Truro (Science Museum Group)
- GWR 4073 Castle Class (steamlocomotives.org)
- GWR 6000 Class (Wikipedia)
- GWR 6000 Class 6000 King George V (Wikipedia)
- Big Four (British railway companies) (Wikipedia)
- London, Midland and Scottish Railway (Wikipedia)
- Railways Act 1921 (Wikipedia)
- GWR 4073 Class (Wikipedia)
- Railways Act 1921 (legislation.gov.uk (UK National Archives))